Request a Callback

Required
Required
Required
#1

Ask the Expert

On this 20 minute phone call, you’ll speak directly with architect Daniel Jones about your project.

Request a feasibility call
#2

Project Planning Pack

Get the project planning pack before you start your building project

Get the planning pack
#3

Important Video

Taking action on what you learn in this video will be the most valuable thing you can do..

Cambridge Planning Applications

Regardless of the size of the project, whether a single story extension or three new houses, Irvine Jones Design can offer invaluable guidance through the planning application process, in what can sometimes feel like a minefield.

Irvine Jones Design has extensive expertise and knowledge of planning policy and the planning application process. We can assist and guide you with any pre-planning problem, guiding you to make the right kind of application - pre-app, outline, planning in principle or full planning etcl. Or, perhaps, you will be able to extend without permission with permitted development rights.

Irvine Jones Design can keep you on the right side of the law and reduce your risk of making costly mistakes that can commonly occur with planning applications.

1.Needs, Options & The Brief

Design - Needs & Options Review

  • Low Commitment Consultation - On site
  • Setting of initial brief
  • Production of sketched plans
  • Proposal of outline Cost/budget notion
  • Conclusion with report issue and outline fee cost

Existing Condition

  • Investigations and studies to explore the feasibility of any potential domestic development
  • Measured building surveys (by others)
  • Topographic site survey (by others)
  • Arboricultural (tree) surveys (by others)
  • Ecological (wildlife) surveys (by others)
  • Existing Site/building drawings

The Brief

  • Development of the design brief from N&OR - wants-needs-aspirations
  • Produce energy performance strategic brief
  • Develop budget cost strategy

2. Design & Planning

Concept + Needs and Options Review Reassessment

  • Review of project constraints & opportunities
  • Simple sketches (outline proposals)
  • Development of Cost/Budget planning
  • Develop energy performance strategic brief

Detail Design for planning submission

  • Developed design drawings
  • Produce daylight/sunlight studies as required
  • Submit proposals to planning for determination
  • Review planners intent at around week six of the determination period
  • Discuss planning outcomes with client
  • On positive planning feed-back - Obtain appointment of other professionals to form design team - Builder/Contractor, Quantity Surveyor (QS), Structural Engineer (SE), Energy Performance Consultant
  • Approach builders and form tender list
  • Advise client on procurement (contract) route options

3. Building Regulations & Tender

Building Regulations

  • Discharge planning conditions as required
  • Develop planning design drawings further into technical drawings with notes to satisfy all regulatory and statutory requirements
  • Produce schedules of information, as required.
  • Develop further energy performance strategy (renewable technologies)
  • Produce u-value calculations - understand building fabric element make-up based on energy performance brief.
  • Review and compile other information, structural engineer specification and detail, Energy performance certification +
  • Submit regulations package to building control body for (conditional) approval

Construction drawings, specification & schedules

  • Specify all building fabric elements & components
  • Confirm sap calculation and U-value suitability
  • Clarify structural details and specification (with structural engineer)
  • Clarify any planning position and pre-start conditions etc.

Tender submission

  • Clarify procurement route with client
  • Produce form of contract
  • Produce form of tender
  • Submit tender/construction set of information to builders/contractors

Tender Review

  • Review tender costs and tender programs received & report to client
  • Agree procurement route and program with builder/contractor
  • Appoint, on behalf of client, builder/contractor

4. Construction

Pre-construction - mobilisation

  • Allow site access for builder/contractor site set-up
  • Generally assist and answer any pre-start questions from builder/contractor

Construction

  • Administer the terms of the building contract
  • Make inspections (usually weekly) and report on observations and progress
  • Issue Architects Instructions (any variation from contract documents)
  • Review Builder/Contractor cost claims
  • Issue Interim cost (Architects) certification

5. Completion, defects & colonisation

Practical completion & 12 months (usually) defects liability period

  • Certify (Architects Certificate) practical completion when reached
  • Issue cost certificate and retention costs to builder/contractor
  • Inspect and produce snagging list of defects at interim stages (if any)
  • Issue instruction for defect remedy (as required)

Final certificate & Finalisation of account

  • Issue final certificate at end of defects liability period
  • Settle account and issue final certificate

6 years continued monitoring of building performance

  • Evaluate occupancy and building performance

Project Kickstart

We are currently offering Feasibility Calls for Cambridgeshire area property owners with plans to build or renovate properties in the next 12 months.

Request a feasibility call

Testimonial

Irvine Jones Design provided an exceptional service with great vision. They took on board all of our needs and requests and produced quality plans and drawings that have enabled us to construct a beautiful home. They also handled all of the planning submissions and communications taking the pain out of that process, while also being available for any questions or issues during the build, and we had a lot. They were a pleasure to work with and I can highly recommend them for your planning and architectural needs.

Testimonial

Irvine Jones Design were originally brought in to get me from a blank canvas stage, design and through planning up to the first day of build for my loft conversion of my Victorian house in London which was all a success. I opted to source the building company and project manage myself and as it happened I didn't make the best choice and many issues ensued turning it into a difficult job, but thankfully I was back on to Daniel quite a bit over the following months and he made the whole ordeal much better. With hindsight I would've gone all in with IJD from start to finish, but you live and learn.